Another operator is running a "test" train from Grong Grong to Manildra that is 1000 tonnes over the rated load for the three locos that are on the train.
-
Another operator is running a "test" train from Grong Grong to Manildra that is 1000 tonnes over the rated load for the three locos that are on the train.
It has stalled on the hill coming out of Junee. This has fucked the show.
-
@matt out of ignorance and curiosity: what rough percentage of the rated load would 1000 tonnes be?
other than “enough to cause problems for everybody else”
-
@valhalla The rated load for those locos is 6000 tonnes.
-
@matt thanks
that's. quite a bit.